29 LOT RESIDENTIAL SUBDIVISION INFRASTRUCTURE

We laid all the underground and above ground utilities, including crossing Missouri Ave in central phoenix, placed concrete, paved, laid in a pool, landscaped. Basically prepared the site for vertical construction of the homes. It was a fast track 5-month job. Completed July 2015.